[ Accessibility | Jump to content]
Se på kart
X

Offshorenyheter








Alle Fare Aktivitet Nyheter

Klar

Pre-Lay of Anchors and Subsea Gravity Bases at Golden Eagle Field (14/26)



As per the consent to locate, please be advised that anchor handling operations are planned to take place at the CNOOC Golden Eagle location. Following this pre-laying of the BOP tethering system (gravity bases) will also take place, which is also covered in the consent to locate application. Note: the gravity base locations are inside of the anchor spread.


The Olympic Zeus (Olympic Subsea) will load up with equipment on Friday 11th August 2022 at Montrose. It will then depart to the Golden Eagle location and will pre-lay 8x anchors as outlined in the consent to locate. The vessel then will go to Peterhead and load the subsea gravity bases and return to the Golden Eagle field to deploy same. 

 

1. Anchor handling operations are planned to take place from Saturday 13th August 2022

2. Pre-laying of the BOP tethering system (gravity bases) will take place on Monday 15th to Tuesday 16th August 2022

Se et detaljert kart på vår bulletin-webside

Vis mer

Inspection Campaign 2022 - North Sea



Atlantis Dweller (Call Sign C6DX6) will be carrying out Subsea Asset Inspection work both within and between (along pipeline routes) the locations noted below: Start Date = around 8th August 2022. Duration expected to be approx. 40 Days 16/8/22: Project Extended to 18th September 2022


Vis mer

Riser removal/recovery - Anasuria Field Pipeline works



A DSV will be on location to conduct the second phase of riser recovery and replacement operations within the 500m zone of the Anasuria FPSO, located within UKCS block 21/25 in the central North Sea, approximately 157km east of the Scottish coastline. Heading Control Tugs will also be in field.


The DSV is scheduled to mobilise in Aberdeen on 23rd August 2022 . The activities are expected to take ca. 25 days to complete.  All activities will take place within the existing 500 m safety zone of the FPSO.

 

The activities are to recover and replace the test production riser and production riser. Grout bags will be installed to support the weight of the replacement risers.  

Se et detaljert kart på vår bulletin-webside

Vis mer

Inspection / Repair / Maintenance & Decommissioning Work 2022 - Leadon & Janice



Siem Spearfish (Call Sign: C6DA7) will be carrying out IRM (Inspection / Repair / Maintenance) and decommissioning work in the vicinity of the locations noted below: Start Date = around 14/8/2022. Duration expected to be approx. 40 Days, till 30/9/2022


Vis mer

Debris Survey - Hoton Platform



Perenco UK Limited is planning to sail from Grimsby on the 27th August 2022 to undertake a debris Survey at the Hoton platform using vessel N-Sea Geo Focus. The survey area is 1km by 1km box centered on the platform location within Block 48/07. The survey comprises of a geophysical survey using Multi-beam Echo Sounder, side scan sonar and passive magnetometer.


Vis mer

East Irish Sea Decommissioning Campaign



DSV Boka Topaz is due to mobilise on 2nd September to undertake a ~34 day offshore campaign to execute an East Irish Sea Decommissioning Campaign. The vessel will be working at Millom East, Millom West, DPPA, Dalton and at open water wells Crossans and Darwen. Upon completion of the offshore campaign, the vessel will demobilise to a North Sea port. Additionally, the Seajacks Leviathan will be along side the Millom West platform for approximately 50 days from the 1st September.


DSV Boka Topaz is due to mobilise on 2nd September to undertake a ~34 day offshore campaign to execute an East Irish Sea Decommissioning Campaign. The vessel will be working at Millom East, Millom West, DPPA, Dalton and at open water wells Crossans and Darwen. Upon completion of the offshore campaign, the vessel will demobilise to a North Sea port. Additionally, the Seajacks Leviathan will be along side the Millom West platform for approximately 50 days from the 1st September. 

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Nearshore Pipeline Inspection PL20 & PL21 (Ref: 1397)



A 5 Day Nearshore Pipeline Inspection PL20 & PL21 using vessel Titan Discovery call sign: 2HCR3 between 12th May 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

ENI UK Limited

Bosakalis (TBC)

Titan Discovery

2HCR3

N/A

12/05/2022 - 31/12/2022

For 5 Days

48, 52

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Former Guinevere Platform 48/17-Post Decom (Ref: 1408)



A 28 Former Guinevere Platform 48/17-Post Decom using vessel Braveheart Spirit Call sign: PEJO between 7th August - 31st October 2022


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Perenco UK Limited

Braveheart Spirit

PEJO

N/A

07/08/2022 - 31/10/2022

For 28 Days

48

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Former Welland Platform 53/4a-Post Decom (Ref: 1407)



A 28 Day former Welland Platform 53/4a-Post Decom using vessel Braveheart call sign: PEJO between 7th August - 31st October 2022


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Perenco UK Limited

Braveheart Spirit

PEJO

N/A

07/08/2022 - 31/10/2022

For 28 Days

53

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Transocean Enabler



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Seafox 4



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Survey - Former Tyne Platform 44/18A Post Decom (Ref: 1409)



A 28 Day Former Tyne Platform 44/18A Post Decom using vessel Braveheart Spirit call sign: PEJO between 7th August - 31st October 2022


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Perenco UK Limited

Braveheart Spirit

PEJO

N/A

07/08/2022 - 31/10/2022

For 28 Days

44

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Former Thames Platform 49/28-Post Decom (Ref: 1410)



A 28 Day Former Thames Platform 49/28-Post Decom using Vessel: Braveheart Spirit Call sign: PEJO between 7th August - 31st October 2022


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Perenco UK Limited

Braveheart Spirit

PEJO

N/A

07/08/2022 - 31/10/2022

For 28 Days

49

Se et detaljert kart på vår bulletin-webside

Vis mer

Anasuria Hibiscus UK Ltd - Teal West Field - Notification of Planned Survey Vessel Operations



Anasuria Hibiscus UK Ltd intend to conduct survey vessel activity on the Teal West Field in the UKCS. The Gardline Kommandor Susan vessel will be mobilising to the field to conduct a Geotechnical SI survey. The vessel is expected to mobilise to the field on 29/08/22.


Vis mer

Post Decommissioning Surveys at the Thames, Welland, Guinevere & Tyne Former Platforms



Perenco UK Ltd is planning to sail to the decommissioned platform locations and pipeline to perform a series of geophysical and environmental surveys. The survey will be covering a 1 km2 site, which is centred on the previous platform locations.


The N-Sea Braveheart Spirit will mobilise from Umuiden on the 12th August for a 18 day campaign

 

Vessel Name

Braveheart Spirit

 

 

Port / Field / Pipeline

Co-ordinates

Date

Start Location:

IJmuiden

LAT: 52°27'30.9"N

LONG: 4°35'00.7"E

12/08/2022

Location 1

Thames former platform

LAT: 53.0879N

LONG: 2.6766E

 

Welland former platform

LAT: 53.0879N

LONG: 2.6766E

 

Location 2

Guinevere Platform

LAT: 53.4059N

Long: 1.2707E

 

Location 3

Tyne Platform

LAT: 54.4560N

LONG: 2.4842E

 

Demob location

IJmuiden

LAT: 52°27'30.9"N

LONG: 4°35'00.7"E

30/08/22

Se et detaljert kart på vår bulletin-webside

Vis mer

Cement Overspill at Jacky Field



Cement over spill from historic drilling campaign. Noticed when Jacky platform was removed. This item could potential snag. Approximate size 4m x 5m. 2m in height.


Vis mer

Irish Sea Pioneer at Lennox for Pigging activities



ISP will be at Lennox platform for pigging activities.


Vis mer

Subsea Pipeline Activities - Pickerill A & B



Perenco Gas UK Ltd is planning to cut and remove the decommissioned Pickerill A and Pickerill B pipeline ends. All pipeline operations are to be undertaken within the Pickerill A and Pickerill B 500 m safety zones. The Maersk Achiever will mobilise from Clipper/Duthie’s Quay Aberdeen on the 11th August for a 10 day campaign


Date

Location

Coordinates

11/08 – 13/08

Clipper / Duthies Quay Aberdeen

57o09’ N

02 o 04’ W

13/08 – 14/08

Transit to Inde 23A

-

14/08

Inde 23A

53° 19' 24.9732" N

02° 34' 29.8615” E

14/08 – 15/08

Transit to Pic A

-

15/08 – 19/08

Pic A

53° 32 59.9047” N

01° 04' 38.5008"E

19/08 – 20/08

Pic B

53° 31 29.7835” N

01° 09' 38.4042"E

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - West Linus



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Seafox 2



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Erda



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Maersk Resolute



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Maersk Intrepid



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Well-Safe Guardian



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Deepsea Yanti



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Transocean Equinox



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Survey - Lancaster IRM



Subsea inspection activities within 2.5km of Aoka Mizu FPSO.


Vis mer

Marigold and Sunflower Fields - Notification of Planned Survey Vessel Operations



Hibiscus Petroleum Berhad intend to conduct various vessel-based survey activities in the Marigold and Sunflower fields.


The survey vessel GeoOcean III intends to conduct a series of geophysical (MBES, hull-mounted SBES, SBP, SSS, magnetometer, and 2DHR), shallow geotechnical (borehole CPT and VC), environmental (benthic grabs and DDV), and inspection (ROV) surveys.

 

These surveys will take place at various locations within the Marigold and Sunflower fields, and between the Marigold field and the Piper Bravo platform. Details of relevant coordinates are included in this notice. 

 

 

The vessel is planned to mobilise around 19th August 2022. Survey activities are expected to be concluded by the end of October 2022.

 

For further details please contact:

 

John Fleming

HSE Manager

Anasuria Hibiscus UK Limited

john.fleming@hibiscuspetroleum.com 

 

 

 

Se et detaljert kart på vår bulletin-webside

Vis mer

Nearshore Pipeline Survey - Bacton & Leman Bank Pipeline Survey



Geophysical Nearshore Pipeline inspection campaign of 1 section of pipeline on approach to Bacton & section of pipeline at Leman Bank. Using the vessel Titan Discovery. Mobilisation around 6th August, project duration 7-10 days.


Hull-mounted Multibeam Echosounder and towed side scan sonar, ROV & Environmental Sampling/Camera (ROV & Env at nearshore section only). Survey Corridor approx +/- 100m. Survey to be carried out on board Titan Discovery - 12 hour (daylight) operations only. Mobilisation around 6th August, project duration 7-10 days (weather dependent)

Se et detaljert kart på vår bulletin-webside

Vis mer

Subsea Clearance Project - Ex Northern Producer FPF 500m Zone



EnQuest Heather Ltd intends to undertake the seabed clearance works in the ex Northern Producer FPF 500m zone in relation to Dons Field decommissioning works commencing 01 April 2022.


The workscope comprises of several ROV Construction Support Vessels (CSV) performing the seabed clearance of the risers, Mid Water Arch, Riser Base Structure and surface laid spoolpieces, pipelines and umbilicals up to the point of burial.

 

Initially an ROV Construction Support Vessel (CSV) will perform the recovery of the concrete protection mattresses from over the surface laid spoolpieces, pipelines and umbilicals and will perform the cuts on these items up to their point of burial at full trench depth or start of rockdump. This will be followed by an Anchor Handling Tug (AHT) which will recover the Flexible risers and the surface sections of the flowlines and umbilicals before releasing the Mid Water Arch (MWA) and floating it to the surface. The MWA will then be towed to Lerwick in the Shetland Isles for disposal.

 

Finally another CSV will be in field to perform the recovery of the MWA clump weights, Riser Base Structure, rigid spoolpiece and pipeline sections along with any remaining concrete protection mattresses and grout bags. The 500m zone will then be surveyed for debris, the debris will be recovered and a final 500m zone MBES clearance survey will be performed to confirm the 500m zone is clear of any oil field related debris and that no snag hazards remain. An over trawl survey will then be performed by the SFF to confirm there are no snag hazards before issuing a seabed clearance certificate and opening up the area to fishing activity.

 

All the vessels will be positioned within the ex Northern Producer FPF 500m Zone during these activities with the AHT also towing the MWA to Lerwick along a predetermined tow route.

Se et detaljert kart på vår bulletin-webside

Vis mer

NUI NavAid Installation - Brent Charlie



Commencing September 2022 - a new NUI (normally unmanned installation) NavAid system will be installed on the Brent Charlie Oil and Gas Installation. The system will be in operation from October 2022.


Brent Charlie is a manned production platform which served the Brent and Penguins reservoirs. The installation has now entered the Cessation of Production (CoP) phase and is due to down staff in late 2022. From October 2022 a NUI NavAid lighting system will be in operation, through to mid-2023. The specification of the system is as follows:-

 

Two off main white lanterns with a minimum range of 10NM to be mounted in the north-east and south-west corners of the platform. Both lanterns will be synchronised and exhibit flashing a Morse ‘U’ character every 15 seconds. A photocell shall be provided to ensure the lanterns operate within the required period of 15 minutes before sunset to sunrise and whenever visibility is below 2NM. Each lantern shall have a backup in case of failure of the main lantern. The main white lanterns shall have an IALA Category 1 availability factor (99.8%).

 

It is proposed that that the installation and subsequent commissioning of the new NUI NavAid lighting system will commence around the 2nd week of September 2022 and be completed by the 2nd week of October 2022. Once successful commissioning has been executed, it the existing lighting as detailed in the CtL permit (CL/110/6 V1) will be switched off permanently. This will effectively mean that only the NUI NavAid lighting will be in operation from October 2022 (install date) to the date of topsides lift (mid 2023). Should a fault occur with the new NUI  NavAid lighting system, the existing system will be reenergised until such time as the new NUI NavAid is repaired and is back in service. The current foghorn capability as detailed in CL/110/6 V1 will be retained until down staff in December 2022 (current date). Foghorns will be switched off at down staff (there will be no power generation capability available after down staff).  

 

Further notifications as required by CL/110/7 V2 will be submitted in due course.

Se et detaljert kart på vår bulletin-webside

Vis mer

Judy oil export tie in spool at NORPIPE wye - pipe exposure



Judy oil export tie in spool at NORPIPE wye - pipe exposure over ca 50m creating additional trawl hazard. Rock was removed from Judy oil export tie in spool at NORPIPE wye in mid 2022 in support of valve changeout at NORPIPE wye. Valve changeout has been delayed until 2025 at which point rock will be reinstated. Absence of rock poses an increased risk of snagging fishing nets and also of pipeline damage. 


Vis mer

Well Abandonment - Ettrick E4



COSL Innovator abandoning Ettrick E4


Vis mer

Diving Operations in the Forties Field August 2022



Apache will have the DSV Seven Kestrel in the Forties field in mid-August 2022 for maybe 14 days carrying out diving operations within the Fortes Alpha 500m zone.


Diving operations within the Forties Alpha 500m zone laying and tie-ins of spools

Se et detaljert kart på vår bulletin-webside

Vis mer

Diving Operations in the Beryl Area



DSV Seven Kestrel will be carrying out diving operations in the Beryl Area from 15 July 2022 for 27 days. These operations will be within the Beryl Alpha platform 500m zone and Garten 500m zones. DSV will be returning to the Beryl Field in late August 2022 to complete some IRM diving works until early September 2022.


Vis mer

Balmoral Well Intervention Operations



The Helix Seawell Light Well Intervention Vessel is in-field to conduct well intervention activities on the 16/21a-B3, 16/21a-B4, 16/21a-B5, 16/21a-B6, 16/21a-B10 and 16/21a-2 wells.


Vis mer

Rig - Ensco 92 move to North West Bell Well



Chrysaor (a Harbour Energy company) plan to move the Ensco 92 Jack-up drilling rig to the North West Bell field location to perform abandonment operations on the North West Bell 49/22-20Y development well. Throughout well abandonment operations there will be a dedicated ERRV on location monitoring the surrounding sea area. This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Dropped Mattress - Southwark



During spool mattress installation by the EDT Hercules at the 24” Southwark pipeline export spools at the Southwark Platform an installation strop choked around a loop on the installed mattress. This was only apparent when the frame was recovered to surface (in the safe over boarding area 30m clear of any subsea asset) and the mattress was still attached. 1 x mattress (L=6 x W=3 x H=0.15) It is planned to recover the mattress in circa October 2022 during the Seven Atlantic diving campaign.


The mattress and the frame was returned subsea in the safe over boarding area and the bound up loop on the mattress was cut to deposit the mat on the seabed and releasing the frame to be recovered back to deck. Consideration has been given to safe recovery of the mattress using the infield vessel and onboard ROV. However, it has been concluded that this can be achieved more safely during the next planned diving campaign in October. An as left survey of the mattress was completed by HD54 WROV.

 

Se et detaljert kart på vår bulletin-webside

Vis mer

Ocean Endeavor Drilling Rig at Tybalt Well



The Ocean Endeavor rig is moored at the Tybalt well in the Penguins field for well operations.


The Ocean Endeavor rig is moored at the Tybalt well in the Penguins field for well operations. 

 

The rig has 12 anchors including ground chain which extend ~1.5km from well centre and well outside the 500m zone. 

 

The anchors are connected to the rig with chain and fibre ropes, with the catenaries above the sea floor. 

Se et detaljert kart på vår bulletin-webside

Vis mer

Pre-Laid Anchors - Rockhopper



12 x Pre-lay anchors left on seabed at Rockhopper well location. Anchors and ground chain, extending 1.5km from Rockhopper well center. 


Vis mer

HAEVA JUB at Ravenspurn North



Well operations on Ravenspurn North utilizing the HAEVA JUB


Vis mer

Survey - Marigold & Sunflower (Ref: 1426)



A 30 Day Site Survey at Marigold & Sunflower using vessel Geo Ocean III call sign: LXGP between 01st August 2022 - 31st October 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
GEOxyz

Geo Ocean III

LXGP

1200m

3m

01/08/2022 - 31/10/2022

For 30 Days

15

Se et detaljert kart på vår bulletin-webside

Vis mer

Drilling Activity - Valaris 122 at Orlov



The Valaris 122 (jack up drilling rig) will be conducting drilling operations at the Orlov field on the 22/08a-E Orlov well. The Valaris 122 will be drilling at a standalone location in the Orlov field on a single well campaign. The total duration of drilling and completion activities is expected to last approximately 108 days.


Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone. 

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Maersk Reacher



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig Move – Valaris 121 to Judy field



Chrysaor (a Harbour Energy company) plan to move the Valaris 121 Jack-up drilling rig from the Dunnottar field location to the Judy Riser Platform to perform drilling operations on the Judy 30/07a-RD development well. Throughout well operations there will be a dedicated ERRV on location monitoring the surrounding sea area.


Vis mer

Rig Move from Nigg to Anglia NUI YP Platform



The Wellsafe Protector jack-up MODU will be completing a rig move from a quayside location at Nigg, Cromarty Firth to a location immediately next to the Anglia NUI YP platform in the southern North Sea. The rig move will be completed with three vessels, one towing and two tug vessels to assist with final rig position next to the platform. The rig move and well work at Anglia will be getting completed on behalf of Ithaca Energy.


The earliest possible date for the rig move is mid August extending to the end of September to account for the planned rig move window and possible delays en route.

Se et detaljert kart på vår bulletin-webside

Vis mer

Pre-Lay Anchor pattern Well-Safe Guardian at Hannay H01 Well



Please be advised that Well-Safe Solutions, on behalf of Repsol Sinopec Resources UK propose to place moorings on the sea-bed at the Hannay Field from 25/01/22 in advance of the mooring of the Semi-submersible Rig Well-Safe Guardian.


Vis mer

GoldenEye Post-decommissioning Environmental Survey



Shell plans tp conduct an environmental survey around the area of GoldenEye platform, which has been decommissioned.


An environmental survey comprising of taking seabed samples and photography of the seabed will be conducted within the vicinity of the previously located Goldeneye platform within the Central North Sea.  A SSS and MBES survey will be performed of the area prior to deployment of the camera and seabed sampler in order to ensure there are no hazards on the seabed.

Se et detaljert kart på vår bulletin-webside

Vis mer

Gannet Redundant Export Pipeline Environmental Monitoring Survey



Shell plans to conduct an environmental monitoring survey of redundant section of the Gannet export oil pipeline that has been placed into the Interim Pipeline Regime (IPR).


An environmental survey comprising of taking seabed samples and photography of the seabed will be conducted along the Gannet Redundant Export Pipeline within the Central North Sea.  A SSS and MBES survey will be performed of the area prior to deployment of the camera and seabed sampler in order to ensure there are no hazards on the seabed.

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Transocean Norge



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Elgin-Franklin GWA Surveys



PGS Ramform Atlas (Call Sign C6AX2) will be carrying out Streamer 4D Seismic Survey work between the locations noted below: The Vessel will be towing 15 x 5000m streamers and will have limited manoeuvrability; please keep 3Nm minimum CPA. Seismic Source Volume = 3150cu.in source at 2000 psi operating pressure. Start Date = around 1st August 2022. Duration expected to be approx. 2 months to end-September


PGS Ramform Atlas (Call Sign C6AX2) will be carrying out Streamer 4D Seismic Survey work between the locations noted below:

The Vessel will be towing 15 x 5000m streamers and will have limited manoeuvrability; please keep 3Nm minimum CPA.

Seismic Source Volume = 3150cu.in source at 2000 psi operating pressure.

Start Date = around 1st August 2022.  Duration expected to be approx. 2 months to end-September

14/7/22: Additional ‘Navigation Area’ added to cover extended navigation during periods of streamer recovery, streamer deployment and adverse weather .

 

4 x Original Area Points  +  6 "Additional" areas (Items 5-10)

 

Area Point 1        57° 12' 23”N  2° 01' 29"E

Area Point 2        57° 04' 50"N  2° 16' 53"E

Area Point 3        56° 43' 58"N  1° 42' 42"E

Area Point 4        56° 51' 26"N  1° 27' 20"E

Additional 5         57° 25' 48"N  0° 11' 06"W

Additional 6         57° 25' 49"N  0° 18' 05"E

Additional 7         57° 01' 05"N  0° 35' 30"E

Additional 8         56° 56' 36"N  1° 40' 09"E

Additional 9         56° 47' 00"N  1° 40' 09"E

Additional 10       56° 49' 23"N  0° 08' 59"W

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Ocean Patriot



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Decommissioning - Amethyst A2D



Please be advised that decommissioning activity will be taking place on the Amethyst A2D. Arrival and siting of jack up barge alongside the platform for rendering the platform hydrocarbon free in preparation for the removal of the platform. Earliest Start date 19th July 2022 estimated completion 1st November 2022.


Vis mer

Rig - Paul B Loyd Junior



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Stena Don



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Hazard - Boulder (T22-0938) North of Fulmar



During debris recovery, a large boulder was observed by the ROV. Boulder dimension 3.0m x.1.6m x 0.6m.


Vis mer

Hazard - Block (T22-0521) at Curlew D safety zone



During debris recovery, a large block was observed by the ROV. Large block with dimensions of 4.0m x 2.2m x 0.5m found in position 


Vis mer

Survey - Leverett Field (Ref: 1422)



A 15 Day Site Survey at the Leverett Field using vessel Ocean Reliance call sign: HP6391 between 25th July 2022 - 30th October 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
Gardline

Ocean Reliance

HP6391

N/A

25/07/2022 - 30/10/2022

For 15 Days

21

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Valaris Norway



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Transocean Endurance



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Valaris 120



Oil & gas rigs are protected by a 500m safety zone and some may have anchors extending hundreds of metres outside this zone.


Vis mer

New Safety Zone: Tolmount East Drill Centre, Tolmount East, Block 42/28d



A new safety zone has been granted by the Secretary of State for the above location/structure. For installations already on location the safety zone will come into force on 20th July 2022. Installation NOT Stationed at the time this order is made.


may also replace a safety zone in place around a platform, or other surface structure for the purposes of decommissioning.

 

Your FishSAFE Information will be updated in the next release v44

Se et detaljert kart på vår bulletin-webside

Vis mer

New Safety Zone: Manifold M12, Foinaven, Block 204/24a



A new safety zone has been granted by the Secretary of State for the above location/structure. For installations already on location the safety zone will come into force on 20th July 2022. Installation Stationed at the time this order is made.


This safety zone may be new, or an amendment to an existing zone. It may also replace a safety zone in place around a platform, or other surface structure for the purposes of decommissioning.

 

Your FishSAFE Information will be updated in the next release v44

Se et detaljert kart på vår bulletin-webside

Vis mer

Mariner Field 4D Seismic Survey



Multi vessel 4D seismic survey of the Mariner Field area: Main survey vessel SW Amazon Warrior (call sign 3FNE9) will be supported by the SW Cook, Mainport Pine and Apollo Moon


4D Seismic survey of Mariner Field area using vessels listed below planned for commencement August 2022:

 

The towed array from the Amazon Warrior (diagram attached) will be up to 525m wide and extend up to 3600m from the stern of the vessel. The guard vessel Apollo Moon will support during the duration of the survey and issue warnings as required.

 

Vessel Name Call Sign IMO Purpose
SW Amazon Warrior 3FNE9 9662394 Main seismic vessel
SW Cook 5BPC2 9488554 Secondary seismic vessel / source vessel for undershooting
Mainport Pine V7ZH8 9659335 Supply vessel
Apollo Moon HP9796 9305829 Guard vessel

 

Se et detaljert kart på vår bulletin-webside

Vis mer

BP-7 spool and jumper installation - Western Isles South Drill Centre manifold



The new BP-7 wellhead will be tied in to the existing Western Isles South Drill Centre manifold with new flowlines and hydraulic/chemical electrical jumpers, which will be protected with new concrete mattresses and grout bags.


The tie-in work will be conducted by a DSV and divers. The flowlines and jumpers will be laid on the seabed and connected to the BP-7 tree and the South Drill Centre manifold. The new infrastructure will then be protected with new concrete mattresses and grout bags. The works will be entirely within the existing South Drill Centre 500 m safety exlcusion zone.

Se et detaljert kart på vår bulletin-webside

Vis mer

Well Drilling Campaign - Catcher Infill (Burgman)



Notice to alert sea users to drilling activity within the Catcher Area in block 28/09a, at the Burgman template location, using the Maersk Innovator MODU. The Maersk Innovator jackup drilling rig is currently on location in the Catcher Area, at the Catcher North template.  It is due to complete operations on the current well in late July 2022, then move to the Burgman template location.


Vis mer

Survey - Dunlin Alpha (Ref: 1417)



A 30 Day Route Survey using the vessel Atlantis Dweller call sign: 8PAB3 between 8th July 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
Fugro

Atlantis Dweller

8PAB3

N/A

19/07/2022 - 31/08/2022

For 30 Days

211

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Ben Lawers Site Survey (Ref: 1421)



A 9 Day Site Survey using the vessel Stril Explorer call sign: LAZT7 between 19th July 2022 - 31st August 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
Ocean Infinity

Stril Explorer

LAZT7

N/A

19/07/2022 - 31/08/2022

For 9 Days

204

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Schiehallion Site Survey (Ref: 1420)



A 13 Day Site Survey using the vessel Stril Explorer call sign: LAZT7 between 19th July 2022 - 31st August 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
Ocean Infinity

Stril Explorer

LAZT7

N/A

19/07/2022 - 31/08/2022

For 13 Days

204

Se et detaljert kart på vår bulletin-webside

Vis mer

Dropped Pipeline - Carrack QA Platform



Dropped Pipeline 16 mtr x 4" section of redundant Pipeline resting on seabed. Plans to recover


Vis mer

Survey - Schooner 500m Zone & Schooner Pipeline (Ref: 1419)



A 10 Day Route Survey using the vessel Normand Superior call sign: LATJ7 between 27th June 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
Ocean Infinity

Normand Superior

LATJ7

N/A

27/06/2022 - 31/12/2022

For 10 Days

44

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Ketch 500m Zone & Ketch Pipeline (Ref: 1418)



A 82.5 Day Route Survey using the vessel Normand Superior call sign: LATJ7 between 27th June 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
Ocean Infinity

Normand Superior

LATJ7

N/A

27/06/2022 - 31/12/2022

For 82.5 Days

44

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Valaris Gorilla V



Oil & gas rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Central North Sea Electrification Project - Cable Route Survey and Habitat Assessment



Harbour Energy intend to mobilise the survey vessel m/v "Geograph" (Gardline Ltd) on ~01/08/22, to execute a cable route survey in support of future Central North Sea electrification scopes. The near shore section shall be facilitated by Titan Surveys post 15/08/2022. Survey activity will include geophysical, environmental baseline (benthic) & habitat assessment components of the offshore cable corridor, the intertidal cable corridor, the connection cable corridors and the offshore hub area.


The PfS UK cable to the CNSE Offshore Hub will be approximately 224.4 km in length extending from a landfall location by Peterhead on the Scottish coast to the offshore hub location in the Central Graben area of the North Sea. The proposed coordinates of the offshore hub and UK landfall locations are provided below.

Power from Shore UK - 210km

Easting (m)

ED50 TM0

Northing (m)

ED50 TM0

Latitude (DD)

WGS84

Longitude (DD)

WGS84

Latitude (DMS)

WGS84

Longitude (DMS)

WGS84

Latitude (DMS)

ED50

Longitude (DMS)

ED50

CNSE Hub Location

600685.04

6333603.06

57.133

1.662

57° 07' 57.810" N

01° 39' 42.643" E

57° 08' 00.164" N

01° 39' 48.218" E

Peterhead

NA

NA

57.478

-1.789

57° 28' 40.800" N

01° 47' 20.400" W

57° 28' 43.263" N

01° 47' 14.450" W

 

Planned routing is between the following platforms;

Landfall near Peterhead ref attached charting

Offshore Hub location near Shearwater

Shearwater Platform

Judy Platform

Elgin Platform

Gannet A Platform

Etap Platform

 

Ref attached chartlet and coordinate list for further details of proposed routing.

 

Please contact the undersigned for further information.

 

Se et detaljert kart på vår bulletin-webside

Vis mer

Dismantling & Removal - Brae Bravo Jacket



Please be advised that the SSCV Sleipnir is expected to leave the current Brae Bravo 500m Safety Zone on 25th June 2022 following removal of the Brae Bravo upper jacket. Only the footings and cuttings piles will remain, at an elevation of approximately 28m from the seabed.


Vis mer

BP-7 wellhead and Xmas tree



BP-7 is a new subsea oil well. The wellhead supports a Xmas tree and integrated "fishing friendly" wellhead protection structure. BP-7 is a new subsea oil well. The wellhead supports a Xmas tree and integrated wellhead protection structure. The wellhead protection structure has legs that penetrate the seabed and a ‘fishing friendly’ profile with sloping sides designed to deflect trawls and offer protection against dropped objects


Vis mer

Rig - Valaris Viking



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Valaris 123



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Deepsea Stavanger



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Maersk Resilient



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Paul B. Loyd Jr (PBLJ) MODU on Site (Block 3/24c)



PBLJ on location to carry out exploration drilling. The PBLJ is expected to arrive at North Eigg (Block 3/24c -NE1) to carry out exploration drilling . The work scope is planned to take approximately 4 months. The MODU will be anchored utilising prelaid anchors.


Vis mer

Rig - Swift 10



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Subsea preparation work - New temporary precautionary areas.



Equinor will conduct subsea construction work at the tie-in areas for the new oil export pipeline which will be installed between Gina Krog and Sleipner A. The affected areas are located east of Gina Krog and north of Sleipner A.


Subsea preparation work at areas for tie-in of new pipeline section between Gina Krog and Sleipner A.

New temporary precautionary areas.

 

Between 20.06.2022 and 15.08.2022, Equinor will conduct subsea construction work at the tie-in areas for the new oil export pipeline which will be installed between Gina Krog and Sleipner A. The affected areas are located east of Gina Krog and north of Sleipner A.

 

The new pipeline will be designed to be overtrawlable when in operation, but trawl / bottom fishing activities near these construction areas must be avoided during parts of the construction period. Equinor will therefore establish temporary precaution areas at these locations which will be surveilled to prevent damages to fishing equipment and subsea infrastructure.

 

The zones have a radius of 500 m with centre as given in the table below.      

 

Positions (WGS84) of temporary precautionary areas / surveillance zones at the tie-in locations

 

Location

Latitude

Longitude

Gina Krog tie-in area

58° 34.349’ N

1° 42.524’ E

Sleipner Øst tie-in area

58° 23.735’ N

1° 54.962’ E

 

Sleipner Øst tie-in area will be overtrawlable after August 2023

Gina Krog tie-in area will be overtrawlable after October 2024

 

Questions can be directed to Equinor Marin:

+47 55 14 32 78, opcse@equinor.com, or VHF ch 14.

 

Vessels which will be involved in marine construction activities at the temporary precautionary areas

Vessel name

Activity

Period

Apache II

Subsea construction work – preparations of tie-in locations

July 2022

 

 

Se et detaljert kart på vår bulletin-webside

Vis mer

Drilling Operations - Central North Sea 22/11b



Capricorn are the license Holder for License P2379 in the Central North Sea, approximately 174km East of Aberdeen. On the 16th of May, we are planning to begin exploration drilling activities within UKCS block 22/11b (please see location map below). Drilling operations are planned to take 72 days (dry hole case) and 102 days (success case). However, permits have been requested until the 30th of November 2022 to account for any unforeseen delays.


Please also note that the start date of the 16th of May is subject to our drilling rig finishing its current operations as planned and this date may slip. 

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Safe Caledonia



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Noble Sam Turner



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig Move - Deepsea Atlantic



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Survey - Finlaggen Site Survey (Ref: 1402)



A 8 Day Site Survey at Finlaggen using vessel Geo Ocean V call sign: LXGV between 27th May 2022 - 30th November 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

GEOxyz Offshore

Geo Ocean V

LXGV

N/A

27/05/2022 - 30/11/2022

For 8 Days

21, 15

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Maersk Integrator



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Survey - Callanish Site Survey (Ref: 1399)



A 15 Day Site Survey at Callanish using vessel Ocean Reliance call sign: HP6391 between 1st June 2022 - 30th September 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Gardline Ltd

Ocean Reliance

HP6391

N/A

01/06/2022 - 30/09/2022

For 15 Days

15, 21

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Offshore Pipelines & wells (Ref: 1396)



A 31 Day Offshore Pipelines & Wells Survey using vessel Boka Atlantis call sign: V7SG3 between 12th May 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

ENI UK Limited

Bosakalis Subsea Services Ltd

Aberdeen (TBC)

Boka Atlantis

V7SG3

N/A

12/05/2022 - 31/12/2022

For 31 Days

48, 52

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Hewett Pipelines (Ref: 1398)



A 5 Day EBS & Habitat Assessment along Hewett Pipelines using vessel Boka Atlantis call sign: V7SG3 between 12th May 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

ENI UK Limited

Bosakalis (TBC)

Boka Atlantis

V7SG3

N/A

12/05/2022 - 31/12/2022

For 5 Days

48, 52

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Talbot Debris Clearance (Ref: 1390)



A 2 Day Debris Clearance Survey at Talbot using vessel MV Ocean Reliance call sign: HP6391 between 1st June 2022 - 30th September 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block
Gardline Limited

Ocean Reliance

HP6391

N/A

01/06/2022 - 30/09/2022

For 2 Days

30

Se et detaljert kart på vår bulletin-webside

Vis mer

Deployment of Buoys - Beryl SPM-3



Apache have installed to two cardinal buoys at the following locations. It would be appreciated to advise if any other stakeholder should be inform of the installation.


Vis mer

Rig - West Phoenix



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Well Operations - Orlando 3/3b-13Y



PFML are due to conduct well intervention operations at the Orlando 3/3b-13Y well using the Island Innovator rig, pre-lay of 8 anchor mooring spread commencing 20th May 2022. Guard vessel is on location prior to the MODUs arrival in early June 2022 (provisionally 12-60 days post pre-lay operations). Stevpris MK VI anchor type and maximum of 2,680m of chain/fibre rope/wire per anchor.


Vis mer

COSL Pioneer MODU - Captain Field



COSLPioneer MODU will be drilling in the Captain field for Ithaca Energy for approximately 128 days, with the anchors being pre-laid approximately two to four weeks prior to the rig arriving onsite. Activity will take place from 16th May until 14th November 2022.


Ithaca Energy (UK) Ltd is planning to use the COSLPioneer to drill UB05P well and suspend A2Y at Captain Drill Centre C.  The activity will last approximately 150 days (including anchor pre-lay).  The Captain platform ERRV will act as a guard vessel at the location from when the anchors are pre-laid until the COSLPioneer arrives.

The field lies within the United Kingdom Continental Shelf (UKCS) Block 13/22a, approximately 91 km North of Aberdeen and 191 km from the UK/Norway median line.

Se et detaljert kart på vår bulletin-webside

Vis mer

Anchor Pre-Lay at Ettrick Location



Normand Prosper AHV to pre-lay 8x anchors at Ettrick Location. 8x anchors will be laid in the Ettrick field, prior to rig mobilisation forecast for 14th May. 8x anchors will remain laid for Ettrick campaign.


Vis mer

Drilling - Diadem Exploration Well



Capricorn Energy UK Ltd are drilling the Diadem exploration well using the Valaris 123 jack-up rig.


Vis mer

Rig - Deepsea Aberdeen



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Pipeline Installation - Evelyn Field



Tailwind Mistral Ltd intends to install pipelines and umbilicals from the existing Evelyn Well EV01 to the GEEBB Manifold and the Triton riser base, this will comprise: 8" production line with 3" piggyback gas lift line, Control umbilical line.


The Evelyn field is located within UK licence P1792 approximately 7.5km to the South West of the Dana Operated Triton FPSO. The development will consist of a single gas lifted production well EV01.

 

The 8" Pipeline route runs from the Evelyn valve skid (EVVS) drill centre tie-in structure in a north east direction to a comingling tie-in structure (GEEBB) which will comingle production fluids from Gannet E, Evelyn and Bittern. The GEEBB structure will be located outside the Triton swing circle, but inside its 500m safety zone. The 8-inch pipeline will be trenched and buried using trench backfill material. Areas which are not trenched at the Evelyn and Triton approaches will be protected from fishing gear interaction and/or dropped objects by a combination of rock placement and concrete protection mattresses.

 

The 3" Pipeline route runs in a south westerly direction between the GEEBB tie-in and distribution structure to the Evelyn valve skid (EVVS) drill centre tie-in structure. The GEEBB structure will be located outside the Triton swing circle but inside its 500m safety zone.  The 3-inch gas lift pipeline will be piggybacked to the larger 8-inch production pipeline and will be trenched and buried using trench backfill material. Areas which are not trenched at the Evelyn and Triton approaches will be protected from fishing gear interaction and/or dropped objects by a combination of rock placement and concrete protection mattresses.

 

The 9.5 km control umbilical will be installed from the EVVS to the umbilical riser base at Triton FPSO.  The umbilical will contain a total of 16 cores and will provide hydraulic, electrical and chemical supplies from the Triton dynamic umbilical at riser base SY9516A to the EVVS and wells

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Maersk Resolve



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Subsea Structure - Gannet E Tie-In Valve Skid (GETVS)



Tailwind Mistral Ltd intends to install the Gannet E Tie-In Valve Skid at the Gannet E Field


Vis mer

Pipeline Installation - Gannet E Expansion



Tailwind Mistal Ltd intends to install pipelines between the Existing Gannet E Manifold (GEM) to the new Gannet E Tie-in Valve Skid (GETVS) and a 9" production line between the GETVS to the GEEBB Manifold.


Pipeline route runs from the Gannet E Tie in Valve Skid (GETVS) structure at the drill centre in an easterly direction to a comingling tie-in the GEEBB manifold. 

The GEEBB manifold will be located outside the Triton swing circle, but inside the 500m safety zone.

 

The 9-inch flexible flowline will be trenched and buried using trench backfill material. Areas which are not trenched at the Gannet E and Triton approaches will be protected from fishing gear interaction and/or dropped objects by a combination of rock placement and concrete protection mattresses.

 

Methanol will be delivered from the Gannet E Manifold (GEM) to the Gannet E Tie-in Valve Skid (GETVS) via a dedicated 3/4" thermoplastic hose within the GEM to GETVS chemical/hydraulic jumper bundle.  The jumper bundle containing the methanol hose and will be protected from fishing gear interaction and/or dropped objects by a concrete protection mattresses and additional grout bags where concrete mattress placement is not practical. 

Se et detaljert kart på vår bulletin-webside

Vis mer

Subsea Structures - Evelyn Valve Skid



Tailwind Mistral Ltd intent to Install the Evelyn Valve Skid Located near the Evelyn EV01 Well


The Evelyn Valve Skid (EVVS) is part of the Evelyn field development, consisting of a gas lift flowline piggy-backed onto a new production pipeline and a new umbilical for carrying control, power, hydraulic lines and chemicals from Triton FPSO to Evelyn. 

 

Evelyn will be connected to Triton via the existing Triton P1 Bittern production riser. 

 

The Evelyn valve skid (EVVS), will be installed at Evelyn, near the location of the EV-01 well, it will be connected to the EVVS from the EV01 xmas tree by the rigid production and gas lift spools pipeline and electrical and umbilical jumper bundles.  A 9.5 km control umbilical will be installed to the EV01 well via the EVVS to the umbilical riser base at Triton FPSO.  The umbilical will provide hydraulic, electrical and chemical supplies from the Triton dynamic umbilical at riser base SY9516A to the EVVS and wells.

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - North Sea (Ref: 1357)



CGG will acquire ~1800 km² of multi-client 3D seismic data in UK Quad 3 between May and September 2022. Two survey vessels will tow up to 14 8km long hydrophone streamers and a seismic source. The source will emit acoustic energy into the sub-surface that is reflected back to the streamers. The survey is part of a larger ~9000 km² program in Norwegian waters to be acquired concurrently. The UK survey duration is estimated to be 45 days, with 31 days of active source effort.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Shearwater GeoServices AS

Amazon Warrior

3FNE9

Linde-G

V7A2093

Mainport Pine

V7ZH8

Amazon Conqueror

3EBI3

Astra G

HP8210

Mainport Cedar

V7ZH7

8400m

8m

01/05/2022 - 30/09/2022

For 45 Days (in UK)

210,211

2,4

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Prospector 1



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Survey - Tolmount East Site Survey (Ref: 1373)



A 2 Day Site Survey at Tolmount East using the vessel MV Ocean Resolution call sign: 3EIPG between 25th April 2022 - 31st August 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Gardline Ltd

MV Ocean Resolution

3EIPG

N/A

25/04/2022 - 31/08/2022

For 2 Days

42

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Hunter HK-1 Site Survey(Ref: 1369)



A 2 Day Site Survey at Hunter HK-1 using the vessel MV Ocean Resolution call sign: 3EIPG between 25th April 2022 - 31st August 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Gardline Ltd

MV Ocean Resolution

3EIPG

N/A

25/04/2022 - 31/08/2022

For 2 Days

44

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Bell ZX, Victor JM and Kelvin TM Site Survey(Ref: 1368)



A 6 Day Site Survey at Bell ZX, Victor JM and Kelvin TM using the vessel MV Ocean Resolution call sign: 3EIPG or MV Kommandor call sign: MCJO2 between 25th April 2022 - 31st August 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Gardline Ltd

MV Ocean Resolution

3EIPG or

MV Kommandor

MCJ02

N/A

25/04/2022 - 31/08/2022

For 6 Days

49, 44

Se et detaljert kart på vår bulletin-webside

Vis mer

Fishing Advisory Zone - Ninian North



Seabed snagging hazards following the removal of the Ninian North jacket in April 2022 and the removal of the automatic 500-metre Safety Zone.


Following removal of the jacket structure below sea level, there remain a significant number number of seabed structures & items that are potential snagging hazards, within approx. 200 metres of the jacket position. These include:

  • Jacket footings (to 46 metres above seabed)
  • SSIV structure
  • 12 impressed current anodes and associated cables
  • Umbilicals
  • Pipeline crossings, spans, exposed flanges/bolts
  • Pipeline repair clamps with exposed bolts.
Se et detaljert kart på vår bulletin-webside

Vis mer

Noble Hans Duel Drilling Rig



The Drilling Rig Noble Hans Duel will be located next to the Southwark Platform for approximately 200 days from April 2022. The drilling rig Noble Hans Duel is locating to the south face of the Southwark Platform. The rig is expected to be on site in the region of 200 days.  It will be fully within the platform's 500m safety zone.


Vis mer

Rig - Seafox 7



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Confirmation of Cardinal Buoys Deployment – at the Pickerill A Jacket



On the 29th March 2022, Leask Marine's C-Force completed its buoy deployment at 11:00 . The vessel Departed Pickerill A Field at 13:00 for transit to Great Yarmouth after the completion of work and arrived alongside at 20:00 the same day. This is a final notification to confirm the 4 cardinal buoys are in their final position and will remain in place until 30th June 2024 as per approval from ML/784/0.


Pickerill A former Platform Lat: 53° 32’ 57.0875” N Long: 01° 04’ 33.3425” E

 

The cardinal buoys will be deployed within the Pickerill 500 m zone at the following coordinates:

 

UPDATE: The latest version of the marine Licence accepts the 4 buoys final location is precisely as above.

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Greater Schiehallion (Ref: 1360)



A 100 Day site survey at the Greater Schiehallion using the vessels Subsea Viking call sign: LCPX, Veritas Viking call sign: LMIB3, Maria-G call sign: 3FMM5, Artemis Odyssey call sign: LNUT3 between 1st April 2022 - 31st August 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

PXGeo

Subsea Viking

LCPX

Veritas Viking

LMIB3

Maria-G

3FMM5

Artemis Odyssey

LNUT3

160m

8m

01/04/2022 - 30/08/2022

For 100 Days

204, 205

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Diadem Exploration Well (Ref: 1353)



VSP will be used to characterise the Diadem exploration well which will involve the use of a seismic array from the drilling rig. will involve a three-gun array suspended from the rig (3 x 250 cubic inch guns). The VSP will be undertaken for 7 days on the 16" section, 13 days on the 12¼" section and 8 days on the 8½ section. The temporary 500 m exclusion zone of the drilling rig has been assumed as the working radius. Between 1st April 2022 and 30th November 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Capricorn Energy UK Limited

N/A

N/A

01/04/2022 - 30/11/2022

For 1 Day1

22

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig - Askepott



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - West Elara



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Survey - Goldeneye Seabed Clearance Survey (Ref: 1344)



A 0.5 Day Seabed Clearance Survey at the Goldeneye using the vessel Edda Flora call sign: LAJW3 between 01st February 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

DeepOcean AS

Edda Flora

LAJW3

N/A

01/02/2022 - 31/12/2022

For 0.5 Day

14

Se et detaljert kart på vår bulletin-webside

Vis mer

Abandoned Well - 15/24b-5



No structure left on the seabed – decommissioned fully.


Vis mer

Rig - Valaris 72



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Noble Lloyd Noble



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Rowan Stavanger



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - 590021



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Rig - Valaris Gorilla VI



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Survey - Curlew Pipeline and Seabed Clearance Survey (Ref: 1335)



A 5 Day Clearance survey at Curlew B,C,D and pipeline and umbilical routes using the vessel Edda Flora call sign: LAJW3 between 01st February 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

DeepOcean AS

Edda Flora

LAJW3

N/A

01/02/2022 - 31/12/2022

For 5 Days

29

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Kingfisher PL & Umbilical Seabed Clearance Survey (Ref: 1340)



A 2 Day Clearance survey at Kingfisher PL & Umbilical using the vessel Edda Flora call sign: LAJW3 between 01st February 2022 - 31st December 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

DeepOcean AS

Edda Flora

LAJW3

N/A

01/02/2022 - 31/12/2022

For 2 Days

16

Se et detaljert kart på vår bulletin-webside

Vis mer

Snagging hazard - Near Well 3/03-12



Unidentified snagging hazard at, or close to, the location of well 3/03-12.


Vis mer

Snagging Hazards - Decommissioned Murchison jacket footings - Fishing Advisory Zone



600m x 600m box covering the remaining jacket footings post-decommissioning. Area inside this region has NOT been verified by overtrawl survey.


Vis mer

Seabed hazards following removal of Banff FPSO anchors & moorings



A series of deep, steep sided trenches at mooring line touchdown points and areas of disturbed seabed with clay boulders at the anchor locations, caused during recovery of the anchors. Moorings and anchors have been removed, leaving the seabed features.


10 mooring line trenches, varying in length from 70m to 180m; up to 8 metres wide and up to 9 metres deep. These trenches are steep-sided (in many cases vertical, cut into the clay seabed).

 

10 anchor scars, consisting of shallow trenches (20-90 metres long), shallow-sided depressions (less than 2 metres deep) but with areas of significantly disturbed seabed, including clay boulders up to 3 metres in size.

Se et detaljert kart på vår bulletin-webside

Vis mer

MetOcean Buoys - NEP Project



7 MetOcean buoys will be installed to monitor the local metocean conditions within the NEP carbon capture project area. Each location shall have a seabed frame with a navigation buoy on the surface.


The 7 units will have the following equipment:

Units 1, 3, 4, 5, 6 & 7 - Seabed Frame with attached acoutstic release mechanism & surface navigation buoy within 150m of the seabed frame

Unit 2 - Seabed Frame with attached acoutstic release mechanism & surface navigation buoy within 150m of the seabed frame. This unti will also have a second surface buoy attached to the seabed frame to measure additional information.

It is advised to give 200m clearance to these units

Se et detaljert kart på vår bulletin-webside

Vis mer

NW Schooner Subsea Well - Missing Debris Cap



The Debris Cap for the NW Schooner subsea well has been identified as missing, leaving the wellhead more vulnerable to snagging on fishing nets. The Debris Cap is 4.5m x 3.9m x 1.4m and approx 3.5 tonnes, whilst the wellhead stands 6m off the seabed.


The approximate dimensions of the Debris Cap is 4.5m x 3.9m x 1.4m with a weight of approximately 3.5 tonnes. It is not known whether the Debris Cap is lying within a 500m zone of the well. A 200m x 200m area centred on the well has been searched, with no sight of it. Therefore the exact location of the Debris Cap is unknown. The loss of the Debris Cap leaves the NW Schooner wellhead more vulnerable to snagging from trawler/fishing nets. The approximate size of the tree with over trawl legs deployed is 7.8m x 7.8m x 6m high.

Se et detaljert kart på vår bulletin-webside

Vis mer

Rig Move - Maersk Inspirer



Oil & gas rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Deployment of Spherical Directional Waverider Buoy - Northern North Sea



Shell deployed a new wave buoy in the Northern North Sea on 05-October-2021. Colour: Yellow, Size: 0.9 diameter, Fl: 5 10s


Vis mer

Rig - Haven



Oil & gas rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Vis mer

Anchor Listing for Safe Caledonia at Elgin PUQ



The Flotel Safe Caledonia is alongside ELGIN PUQ – within 500m zone. Providing additional accommodation for ongoing fabric maintenance campaign. Anchor Location Listing


Vis mer

Safe Caledonia at Elgin PUQ



The Flotel Safe Caledonia is alongside ELGIN PUQ – within 500m zone. Providing additional accommodation for ongoing fabric maintenance campaign. Duration extended to over Winter at site and recommence work in Spring 2022 to Oct 2022


Vis mer

Fishing Hazard - Dons Fields Decommissioning Works



The Northern Producer FPF has been removed from it’s moorings and towed to port for decommissioning but the subsea assets within the Northern Producer FPF 500m zone will remain in place on the seabed and could pose a snag hazard to fishermen


The Northern Producer FPF has been removed from it’s moorings and towed to port for decommissioning but the subsea assets within the Northern Producer FPF 500m zone will remain in place on the seabed and could pose a snag hazard to fishermen therefore the Thistle Alpha Platform ERRV will act as a guard vessel until the 500m zone clearance is performed in 2022.

 

This includes the 8 No Risers draped over the Mid Water Arch (MWA), the MWA Clumpweight Guide Frame, the Riser Base Structure (RBS) and the surface laid pipelines / Umbilicals.  The MWA will remain in the water column at a depth of 112m and will remain tethered to the seabed via the clumpweight guide frame. The risers will remain draped over the MWA with one end on the seabed and the other end will remain connected to the RBS so that they remain stable. The existing stabilisation mattresses will remain in place over the surface laid pipelines/umbilicals.

Se et detaljert kart på vår bulletin-webside

Vis mer

Application for Offshore Development Area - Seagull Umbilical



Neptune E&P UK Ltd would like to request to establish an additional offshore development area in Block 22/29C for the Seagull Umbilical location.


The Seagull Field is located on UK licence P1622 Block 22/29C. 17km south of the Eastern Trough area Project (ETAP) Central Production Facility (CPF). Neptune will develop the Seagull reservoir as a subsea tie‐back to existing seabed infrastructure over the BP operated ETAP CPF. The development is high pressure and high temperature and Neptune is the Operator for the subsea development. Neptune will also drill and complete the Seagull Wells and shall retain overall Project responsibility.

The Seagull development will require installation of new subsea equipment as follows: Four Xmas Trees; a 4 slot manifold; a 17km control umbilical (including hydraulic, electrical and chemical supplies) direct from ETAP to Seagull; a 5km 10” production pipeline; a 5km 3.5” wash water pipeline from Seagull to the existing Egret manifold; and a Wye manifold adjacent to the existing Egret manifold, through which the new Seagull production pipeline will connect with the Heron cluster pipeline system connected back to the ETAP CPF. From ETAP CPF Seagull oil and gas will be exported to shore through the GAEL and FPS pipeline systems to the Kinneil Terminal onshore.

 

We already have an ODA established covering the Seagull drill centre and the Egret manifold and would like to request to extend the ODA to incorporate the entire Seagull works area. The extended Offshore development area will be required commencing from September 2021 ‐ March 2023.

 

 

Se et detaljert kart på vår bulletin-webside

Vis mer

Survey - Dunnottar Exploration Well VSP (Ref: 1270)



A 1 Day Vertical Seismic Survey between 31st August 2021 and 31st August 2022.


Company Vessels

Towed Cable

Length & Depth

Duration Survey Block

Chrysaor Petroleum

Company U.K Limited

 

5m

31/08/2021 - 31/08/2022

For 1 Day

30

Se et detaljert kart på vår bulletin-webside

Vis mer

Pipeline Span - Dunbar to Alwyn: PL1043



Significant free-spans have been identified along the PL1043 Dunbar to Alwyn pipeline


Significant free-spans have been identified along the PL1043 Dunbar to Alwyn pipeline : Please exercise caution in these areas

Se et detaljert kart på vår bulletin-webside

Vis mer

Plugged and Abandoned Well : Sween



Sween UKCS 3/30 : Abandoned Wellhead (3/30-7)


No overtrawlability trial done yet, rough ground may be experienced.

Se et detaljert kart på vår bulletin-webside

Vis mer

Plugged and Abandoned Well : Balvenie



Balvenie UKCS 3/14: Abandoned Wellhead (3/14d-18)


No overtrawlability trial done yet, rough ground may be experienced.

Se et detaljert kart på vår bulletin-webside

Vis mer

Disclaimer

TO DOWNLOAD THIS FILE, YOU MUST AGREE TO THE TERMS AND CONDITIONS "TERMS" NOTED AT THE FOOT OF THIS WEBSITE WHICH APPLY TO YOUR USE OF THIS WEBSITE AND TO USE OF THE FILE YOU HAVE CLICKED TO DOWNLOAD. IF YOU DO NOT AGREE TO THE TERMS, YOU WILL NOT BE ABLE TO DOWNLOAD THE FILE AND YOU SHOULD NOT USE THIS WEBSITE. TO CONFIRM YOUR ACCEPTANCE OF THE TERMS AND TO COMMENCE THE DOWNLOAD OF THE FILE, PLEASE CLICK THE "DOWNLOAD" BUTTON. IF YOU DO NOT AGREE TO THE TERMS, PLEASE CLICK THE "CANCEL" BUTTON. YOUR ATTENTION IS DRAWN TO CONDITION 3 NOTED BELOW WHICH FORMS PART OF THE TERMS IN RELATION TO OUR LIABILITY TO YOU.

Enig og last ned Avbryt
The website stores some data in your browser. We do not store any personal information. By clicking 'OK', you accept this. See our terms and conditions. OK