[ Accessibility | Jump to content]
View Map
X

News








All Hazard Activity News

Clear

Penguin A2 Choke Change Out



Vessel Name: Seven Atlantic Work Scope: Penguins A2 Choke Flush/Change Out


Show More

Multibeam Bathymetric Survey - Irish Sea Pioneer, Liverpool Bay



Please be advised that Aspect Land & Hydrographic Surveys Ltd (on behalf of ENI UK Ltd) will be undertaking a seabed survey adjacent the Irish Sea Pioneer, Liverpool Bay. Please refer to the attached NtM for more details.


Show More

Survey Activity - Kyla Field



Fugro Searcher to undertake high res 2D seismic survey at proposed drilling location.


Survey works to last 14 days.

A single solid streamer of approximately 1,350 m in length will be towed behind the survey vessel during the 2DHR seismic operations.

See detailed map on our bulletin website

Show More

NEP Endurance Area - Passive Acoustic Monitoring (PAM) Service - BB Ocean



Mariners are hereby advised that the Northern Endurance Partnership (NEP) is continuing to undertake an Offshore Passive Acoustic Monitoring (PAM) Survey within the Southern North Sea. This survey deployed of a series of PAM moorings to support ongoing environmental monitoring activities.


NtM Information Update – 24/12/2025

Mariners are hereby advised that the Northern Endurance Partnership (NEP) is continuing to undertake an Offshore Passive Acoustic Monitoring (PAM) Survey within the Southern North Sea. This survey deployed of a series of PAM moorings to support ongoing environmental monitoring activities.

Deployment of the equipment was carried out during September 2025, and this is now due for servicing.The BB Ocean is estimated to carry out the service of the PAM equipment (description below) on the 8th of January 2026.

The 12 PAM recording stations at the fixed locations (via moorings anchored to seabed) will be serviced and replaced to original their positions. All moorings will remain in place throughout theremaining 9-month monitoring period.

Equipment details are as follows:•1 x ASCR Array: 7 x moorings deployed in a closely spaced configuration (~50 m separation between ARUs)•2 x Localisation Arrays: 2 x seabed landers, within the ASCR array•3 x Standalone Devices: 3 x moorings, distributed across the survey area for wider spatial coverage•4 x cardinal marker buoys

Coordinates are provided in Table 1 and are illustrated in Figures 1 and 2 below. Mariners are advised to maintain a safe distance from the deployment locations at all times.

For further information, contact details for the Fishing Industry Representative and the Company Fisheries Liaison Officer are provided in Section 7.

See detailed map on our bulletin website

Show More

NEP Offshore - Boulder Relocation Campaign - Southern North Sea



Mariners are advised that the Northern Endurance Partnership (NEP) will be undertaking an offshore Boulder Clearance campaign within the southern North Sea. The survey will be conducted by the vessel N-Sea Pathfinder, which is now expected to arrive on site ~ 29th January 2026.


Mariners are advised that the Northern Endurance Partnership (NEP) will be undertaking an offshore Boulder Clearance campaign within the southern North Sea. The survey will be conducted by the vessel N-Sea Pathfinder which now expected to arrive on site ~ 29th January 2026.

The campaign will carry out targeted Boulder Clearance activity from >10m water depth within the NEP fisheries exclusion zone (See Figure 1 and Table 1 below).

The vessel is estimated to arrive on location on the17th January, and the survey is estimated to complete the works ~ 11th March 2026 (weather dependant).

Mariners are advised to maintain a safe distance (of at least 500m) from the survey vessel locations at all times.

For further information, contact details for the Fishing Industry Representative and the Company Fisheries Liaison Officer are provided in Section 7.

See detailed map on our bulletin website

Show More

Decommissioning - Amethyst B1D



The OBANA Heavy Lift Vessel will undertake jacket removal works at Amethyst B1D.


Show More

Rig - COSL Promoter



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Safe Caledonia



The semisubmersible floatel Safe Caledonia is currently located at the Captain Field, positioned on the west side of the WPP platform. The unit is secured in place using a 10-point mooring system. While the floatel itself remains well within the WPP 500-meter safety zone, the majority of its mooring lines extend significantly beyond this boundary. These mooring lines are composed of chain, fiber, and rig wire, and are supported by intermediate buoys.


Show More

Planned Rig Move – Dolphin PBLJ



This is to advise of the upcoming planned rig move for the Dolphin PBLJ. The rig will relocate from the Joanne Field to the Balmoral Field to undertake P&A operations. • Departure from Joanne Field: 21 January (Estimated) • Estimated Duration on Location: Approximately 140 days • Scope: Five well P&A campaign


Show More

Decommissioning - Pickerill A



The OBANA Heavy Lift Vessel will undertake jacket removal activities at the Pickerill A installation.


Show More

NEP- Offshore ROV UXO & Crossing Investigation - 4 Winds



Mariners are advised that the Northern Endurance Partnership (NEP) is continuing to undertake an offshore Unexploded Ordinance (UXO) Investigation survey, within the southern North Sea. The survey is being conducted by the vessel 4-Winds


Mariners are advised that the Northern Endurance Partnership (NEP) is continuing to undertake an offshore Unexploded Ordinance (UXO) Investigation survey, within the southern North Sea. The survey is being conducted by the vessel 4-Winds (details in section 6 of the attached notice) 

 

The survey will carry out targeted investigations of possible UXO targets and crossings utilising an ROV (Remote-Operated Vehicles), from >10m water depth within Block 1 to Block 5 (See Figure 1 and Table 1 in the attached notice)  

 

The survey is now expected to extend into March 2026, due to weather conditions. Updated 7-day lookahead positions of the 4-Winds will be provided to commercial fishing vessels when necessary.  

 

Mariners are advised to maintain a safe distance (of at least 500m) from the survey vessel locations at all times. 

 

For further information, contact details for the Fishing Industry Representative and the Company Fisheries Liaison Officer are provided below and in Section 7 of the notice. 

See detailed map on our bulletin website

Show More

Rig - Valaris 120



Oil & gas rigs are protected by a 500m safety zone and some may have anchors extending hundreds of metres outside this zone.


Show More

Rig - Transocean Norge



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Linus



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Shelf Drilling Fortress move to Teal West



This is to communicate the upcoming planned rig move of the Shelf Drilling Fortress. The rig will be relocated from Queens dock Invergordon to Teal West well (block 21/24d) to carry out drilling and completions operations. The rig is scheduled to depart Invergordon on the 8th of September 2025 and arrive in the Teal field on the 10th September 2025. The rig is expected to be on location for approximately 100 days. Update 5th jan 2026. Planned rig move 9th Jan 2026 off location.


Coordinates:

Starting Point

1 Pilot station 57° 39.6'N 003° 53.4' W

Way Points

2 57° 46.6' N 003° 28.7' W

3 57° 43.7' N 001° 56.5' W

Final Location

4 Teal West 57°16’ 31’’N 00°46’ 28.76’’E

See detailed map on our bulletin website

Show More

Armada Kraken FPSO Navigational Aid Upgrade



The Armada Kraken lighting and fog horn navigational aids will be upgraded between 12/02/2026 - 05/03/2026. During the works, there will be periods of partial or full navigational aid lighting and fog horn outages.


The work scope includes internal cable removal, external cable and equipment removal, installation of new equipment, internal and external cabling and final commissioning. The programme has been designed to retain navigational aid functionality for the maximum possible duration, with no more than thirteen days within the 21-day period expected to involve a partial or full outage of the lighting and/or fog signal systems.

To minimise the impact of any navigational aid outages, the following mitigations will be implemented:

- Outages scheduled during daylight hours, where practicable, with personnel working a day-shift rota to further reduce the impact of partial or full lighting outages

- Continuous monitoring of weather and sea-state forecasts prior to and throughout the work to ensure that critical elements are not taken offline during periods of reduced visibility. Work scopes resulting in foghorn outages will not proceed if poor visibility is forecast.

- Staged disconnection and replacement of lighting and foghorn components to maintain partial system availability wherever possible and minimise periods of full outage.

- Work scopes that do not require isolation of navigational aid systems have been identified (e.g., charger, control panel and battery breaker box replacement) and will be completed while maintaining full lighting and foghorn functionality.

- General and emergency lighting on the Armada Kraken FPSO will remain fully operational throughout the dispensation period and therefore, the asset will be clearly visible in all directions.

- The ERRV will remain on station and will operate the foghorn in accordance with the standard procedure during any period of limited or unavailable foghorn functionality on the Armada Kraken FPSO. This is expected to be required only for a short period within the overall dispensation period.

- ERRV monitoring of marine traffic will continue to ensure no unauthorised entry into the 500m safety zone.

- The MCA and NLB will be consulted regarding the planned upgrade activities and associated temporary system impacts.

- Should any changes to the above plan occur all relevant stakeholders (e.g., OPRED, NLB and the MCA) will be informed and an updated plan with associated mitigations provided at the earliest opportunity.

- Upon successful completion of the plan a further Consent to Locate variation will be submitted and all other stakeholders informed of the completion of the works.

See detailed map on our bulletin website

Show More

Rig - Swift 10



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Deepsea Atlantic



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Prospector 1



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Revoked Safety Zone: Kingfisher BP1.1 Wellhead, Kingfisher, Block 16/8a



A safety zone for the above location/structure has been revoked (will no longer be enforced) by the Secretary of State. This will come into force on 29th December 2025.


Kingfisher note:

 

This safety zone may have been replaced by a new zone, or other zones may exist in the vicinity.

 

Your FishSAFE Information will be updated in the next release.

6.—(1) The Offshore Installations (Safety Zones) (No. 2) Order 2022(7), is amended as follows. (2) In the Schedule (installations), in Part 1, omit the entry relating to “Kingfisher BP1.1 Wellhead, Kingfisher, Block 16/8a”. (58? 46.27’N 01?29.37’E)

See detailed map on our bulletin website

Show More

Revoked Safety Zone: Chestnut Field Well 22/2A-15, Block 22/2A, Chestnut Field



A safety zone for the above location/structure has been revoked (will no longer be enforced) by the Secretary of State. This will come into force on 29th December 2025.


Kingfisher note:

 

This safety zone may have been replaced by a new zone, or other zones may exist in the vicinity.

 

Your FishSAFE Information will be updated in the next release.

5.—(1 ) The Offshore Installations (Safety Zones) (No. 2) Order 2008(6) is amended as follows. (2) In the Schedule, omit the entry relating to “Chestnut Field Well 22/2A-15, Block 22/2A, Chestnut Field”. (57° 57.04’N 01° 12.92’ E)

See detailed map on our bulletin website

Show More

Revoked Safety Zone: Well 22-11x, Block 22/2A, Chestnut Field



A safety zone for the above location/structure has been revoked (will no longer be enforced) by the Secretary of State. This will come into force on 29th December 2025.


Kingfisher note:

 

This safety zone may have been replaced by a new zone, or other zones may exist in the vicinity.

 

Your FishSAFE Information will be updated in the next release.

4.—(1) The Offshore Installations (Safety Zones) (No. 3) Order 2007(5) is amended as follows. (2 ) In the Schedule, omit the entry relating to “Well 22-11x, Block 22/2A, Chestnut Field”. (57° 58.52’N 01° 14.40’ E)

 

See detailed map on our bulletin website

Show More

Revoked Safety Zone: Chestnut Field Well 22/2A-12, Block 22/2A, Chestnut Field



A safety zone for the above location/structure has been revoked (will no longer be enforced) by the Secretary of State. This will come into force on 29th December 2025.


Kingfisher note:

 

This safety zone may have been replaced by a new zone, or other zones may exist in the vicinity.

 

Your FishSAFE Information will be updated in the next release.

3.—(1) The Offshore Installations (Safety Zones) (No. 2) Order 2007(4) is amended as follows. (2) In the Schedule, omit the entry relating to “Chestnut Field Well 22/2A-12, Block 22/2A, Chestnut Field”. (57° 57.32’N 01° 13.74’ E)

See detailed map on our bulletin website

Show More

New Safety Zone: 2. Galahad Installation, Galahad Field, Block 48/12a



A new safety zone has been granted by the Secretary of State for the above location/structure. The safety zone will come into force on 29th December 2025.


Kingfisher note:

 

This safety zone may be new, or an amendment to an existing zone. It may also replace a safety zone in place around a platform, or other surface structure for the purposes of decommissioning.

 

Your FishSAFE Information will be updated in the next release.

See detailed map on our bulletin website

Show More

New Safety Zone: Abbey Wellhead Protection Structure, Abbey Field, Block 47/03i



A new safety zone has been granted by the Secretary of State for the above location/structure. The safety zone will come into force on 29th December 2025


Kingfisher note:

 

This safety zone may be new, or an amendment to an existing zone. It may also replace a safety zone in place around a platform, or other surface structure for the purposes of decommissioning.

 

Your FishSAFE Information will be updated in the next release.

See detailed map on our bulletin website

Show More

Hazardous structure - Frigg



Large T section frame approximately 14 x 7 meters


Large t section frame of approximately 14 x 7 meters located during ROV seabed inspection

See detailed map on our bulletin website

Show More

Rig - Noble Resolute



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Danger - Protruding Isolation Plugs on End of Live Pipeline - Galahad



Following the removal of the Galahad monopod structure Perenco UK is warning mariners of protruding isolation plugs on pipeline PL1166, which is connected to the live/operational Lancelot Area Production System. An Isolated Danger Marker Buoy has been installed at the site of the former Galahad structure to mark this hazard.


Show More

Offshore Development Area - Penguins Redevelopment Project



NOTE: The Penguins Field has been granted an extension to 31/05/26. The project includes extending the life of the existing wells and addition of eight new wells. The new wells will be tied into the existing Penguins infrastructure and connected into a new FPSO. The pipeline system will be split into a North and South production pipeline, with the FPSO positioned close to the centre of the field.


UKCS Block ID: 211/13a and 211/14a 

Water Depths refer to Lowest Astronomical Tide (LAT) with all depths quoted in metres. 

No visible marker (marker buoys) will be deployed. 

Schematic drawing has been attached.

See detailed map on our bulletin website

Show More

PL24 Cut-point Freespan - North Sea



The cut-point of PL24 is exposed and is protruding significantly from the seabed; approximately 18m long and 6m high. This creates an increased risk of snagging of trawling equipment, or similar, compared to a regular freespan.


The cut-point of PL24 is exposed and is protruding significantly from the seabed; approximately 6m from the seabed at its highest point and overhanging approximately 18m long from where the line makes contact with the seabed again. This creates an increased risk of snagging of trawling equipment, or similar, compared to a regular freespan.

See detailed map on our bulletin website

Show More

Rig - Deepsea Aberdeen



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Safe Caledonia



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Irish Sea Pioneer



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Valaris 72



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Deepsea Nordkapp



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Noble Innovator



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rigmove - Valaris 121



Oil & gas rigs are protected by a 500m safety zone and some may have anchors extending hundreds of metres outside this zone.


Show More

Rig - Deepsea Stavanger



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Deepsea Bollsta



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig Move - COSL Pioneer



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Askeladden



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Deepsea Yantai



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Noble Integrator



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Askepott



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Noble Lloyd Noble



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Swift 10 MODU to move on location on the Sean Papa Platform



The Swift 10 is contracted to ONE-Dyas to plug and abandon wells on the Sean Papa platform as part of the Sean Field decommissioning in the Southern North Sea for approximately 120 days. The rig will move from L8-P4 platform (NLCS) to Sean Papa (UKCS).


The Swift 10 will arrive in January to Plug and Abandon the wells and pull the conductors on the Sean Papa manned platform.  The platform and rig will work in combined operation.The process will involve the MODU being towed to location, it will be  positioned temporarily at stand-off position then anchors will be run to move MODU into final position.

The Swift 10 is a MSC SEA-2750 self-elevating unit .  Aids to Navigation are listed as:- AIS, DSC MF/HF, VHF System, ER VHF Portable and RT/DSC, EPIRB,GPS/DGPS, Inmarsat C/ECG, GMDSS PRINTER, VSAT, LRIT, NAVTEX, SART, SSAS

The Rig Move procedure is in conjunction with the Marine Operations manual.  Required rig move notifications will be made prior to the move. 

The navigation lights on the Swift 10 are not able to be synchronised with the Sean PP. Navigation lights for both the Swift 10 and Sean Papa platform will remain turned on.

 

 

 

See detailed map on our bulletin website

Show More

Buoy - Pierce Area #2



Yellow surface float with a diameter of 1 metre.


WGS84:  57° 09' 09.792''N, 002° 15' 28.554'' E

Clump weight: 500 kg steel ballast with mooring line attached

Deployment date: 02/10/2025

 

See detailed map on our bulletin website

Show More

Metocean Buoy Installed - Pierce Area #1



A yellow spherical anchored wave buoy


Clump weight: 500 kg steel ballast with chain

Deployment date: 26/08/2025

Radius cone: ~120m  

Model: Datawell DWR Mk3 buoy

Diameter: 0.9 m

Colour: yellow

LED light: 5 flashes in 10 s 20 s repetition 360° around for 4 Nm distance

 

See detailed map on our bulletin website

Show More

Rig Move - Maersk Inspirer



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Valaris Stavanger



Oil & gas rigs are protected by a 500m safety zone and some may have anchors extending hundreds of metres outside this zone.


Show More

Rig - Valaris 122



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Paul B Loyd Junior



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - West Elara



This oil & gas drilling rig has moved to this new position. Rigs are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Noble Invincible



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Seafox 4



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Ensco 92



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Rig - Valaris 123



This oil & gas drilling rig has moved to this new position. Rig are protected by a 500m safety zone and some may have anchors extending beyond this zone.


Show More

Jackdaw Development - North Sea



The Jackdaw field is an ultra-high pressure/high temperature (uHPHT) reservoir that will be developed with a not permanently attended Wellhead Platform (WHP). Four wells will be drilled at the Jackdaw WHP. The export system consists of a subsea pipeline to the Shearwater platform. Vessels for 2025/2026: Deep Arctic or Deep Discoverer, Sleipnir, Seven Kestrel .


Continuation of Jackdaw Installation 2025/2026

New SSIV, tie-in spools and associated protection will be installed in the Jackdaw 500m zone between the Jackdaw Wellhead Platform and the new pipeline which was installed in 2024.

Sleipnir with associated barge and tugs working in and around the Jackdaw 500m safety zone. 

New electro-hydraulic umbilical and associated protection will be installed between Jackdaw Wellhead Platform and New Jackdaw SSIV.  Cooling Loop may be cleaned if required.

Sat 1st of November 2025 - The Deep Arctic vessel will carry out 4 hours of DP trials.

See detailed map on our bulletin website

Show More

All Asset Inspection Campaign - Northern North Sea



The Vessel Armada 78 will be carrying Inspection Operations (Wells, Subsea Structures & Pipelines) in the vicinity of and between the locations noted below: UPDATE - MOB DELAYED Dates Now = 18th September to 27th November 2025 (Approx 70 Days) UPDATE: Project running over schedule : Now extended until Feb 2026


The Vessel Armada 78 will be carrying Inspection Operations (Wells, Subsea Structures & Pipelines) in the vicinity of and between the locations noted below:

UPDATE - MOB DELAYED Dates Now = 18th September to 27th November 2025    (Approx 70 Days))

UPDATE: Project running over schedule  : Now extended until Feb 2026

See detailed map on our bulletin website

Show More

Metocean Buoy Installed - Penguins Area



A yellow spherical wave buoy with a diameter of 0.9 meters was installed in the Penguins Field. The buoy has a clump weight of 500kg (steel ballast with chain) and has a radius cone of 300m. LED light: 5 flashes in 10 s 20 s repetition 360° around for 4 Nm distance


Show More

Western Isles infield subsea infrastructure decommissioning



Infield pipelines and manifolds associated with the Western Isles Development will be decommissioned


Risers, tie-in spools, manifolds and mid-water arches will be recovered from the seabed. The surface laid pipeline bundles serving the North and South drill centres will have appurtenances removed from their upper surfaces, but will remain in place until a decommissioning option is finalised. Wellheads will be left in place with existing fishing protection structures pending a future plug and abandonment campaign.

New rock armour will be deposited to protect exposed pipeline bundle ends at the North and South Drill Centre and North and South Riser Base locations.

Work is on hold over Winter 2025/2026. A guard vessel will remain on site (weather permitting) over this period. Work will resume in Spring 2026.

See detailed map on our bulletin website

Show More

Infill Drilling - Cygnus Field



The Valaris Norway is adjacent to the Cygnus Alpha, operating within the 500m zone. Anchors may extend beyond this point. *Please note that there is a slight delay between Cygnus A and Valaris Norway navigational aid activation, following assessment a dispensation has been approved under CL/63/8*


Show More

Subsea Decommissioning - Western Isles Locations



Dana Petroleum (E&P) Limited has contracted Boskalis Subsea Services (BSS) for the Western Isles decommissioning project using the CSV Boka Northern Ocean.


Harris and Barra fields are located in Block 201/24a of the UKCS, 160km to the East of Shetland, and apprcximately 500km North-North East of Aberdeen. The water depth in the area varies from approximately 150m to 165m. The Western Isles production storage and offshore vessel (FPSO) has been disconnected and offstation, but production trees and water injections trees via 9-off flexible risers, 2 -off dynamic umbilical's, 2 -off bundle systems with associated spools and jumpers, 2- off mid-water arches (MWA), FPSO mooring piles, concrete mattressess remain on location. Boka Northern Ocean will carryout some of the decommissioning works commencising in early April for up to 90 days on location, note only ROV's operations from the CSV Boka Northern Ocean for this part of the project.

See detailed map on our bulletin website

Show More

204/20a Schiehallion NW Drill Centre Wet Parked Marine Riser



In Q2 2024, a Semi-submersible Mobile Offshore Drilling Unit incurred an unexpected release of the Lower Marine Riser Package, and the associated Marine Riser. This fell to seabed in the Schiehallion NW drill centre. Subsequent works were undertaken to cut the riser into manageable sections, relocate them to a wet park area outside the 500m zone at Schiehallion NW. Stabilisation material was then installed to secure their position pending retrieval to surface and subsequent on-shore disposal.


14 off Marine riser sections remain on the seabed at the location identified on the attached layout drawing. Their positioning has been secured utilising a combination of methods involving the following deployed equipment:

  • 24 off gabion bags (2 te each),
  • 24 off (6m x 3m mattresses),
  • 14 off horizontal nets and 
  • 1 off clump weight.

Plans are underway to retrieve all items during a single campaign scheduled for 2026 following which this notice will be retracted/updated to confirm full removal.

The Marine Riser was cut up, relocated and subsequently stabilised via a Marine Licence (ML/1100) issued by OPRED.

See detailed map on our bulletin website

Show More

Subsea structure with missing roof panels - PL873 "PDF" tee structure



PL873 "PDF" tee structure - roof panel not present.


Show More

Wellhead Protection Structure - Abbey A02



32 ton fishing friendly wellhead protection structure, protruding approximately 6m above the sea bed with a 7m square footprint, protecting the Abbey A02 Wellhead.


Show More

Foinaven Buoyant Risers within Water Column



Subsea Risers which left in the water column at Foinaven following the removal of the FPSO. These buoyant risers are now covered by 3 new 500m safety zones but do still pose a significant snagging hazard due to their size, number (13x) and height above seabed (160m at highest point). There is no surface infrastructure in the area hence this notification to supplement the 500m zones


Show More

Plug and Abandonment Operations - Otter Wells



Noble Patriot to complete plug and abandonment operations at the Otter wells. Positioned with 8 x anchors within the radius of 61 30 52.206 North 00 57 4.215 East. Consent to Locate permit reference number: WIA/1727 CL/1556.


Show More

Weather Buoy Installation – Rosebank Offshore Development Area



A tethered meteorological weather buoy will be installed at the given coordinates. Vessels are requested to keep safe distance.


Show More

Marine Installation Operations – Rosebank Development Area



Multiple vessels will be carrying out pipeline and subsea structure installation activities within the charted Rosebank Development Area. Other vessels are requested to keep safe distance.


Show More

Nelson Platform Derrick & Substructure Removal Operations



Derrick & Substructure Removal Operations. Removal operations in advance of platform decommissioning. 


Show More

Solan platform has commissioned a Solar Navaid system



The Solan platform has commissioned a Solar Navaid system which is monitored by Trinity House.


Show More

Noble Innovator - Mungo



Please be advised that the Jack-up rig 'Noble Innovator' is alongside the Mungo Platform, and will remain in this position for the foreseeable.


Show More

Pipeline and Umbilical Installation (Subsea) - Belinda



Installation of oil production flowline, gas lift pipeline and service umbilical.


An 8 inch oil production flowline will be installed (trenched and buired) from the exisiting GEEBB manifold (at Triton FPSO) to the new Belinda Valve skid located approx 5km south east of Triton. A 3 inch gas pipelines (piggy backed with the 8 inch) will also be was installed the same trence. 

A servise umbilical will be installed from the existing Evelyn valve skid to the Belinda valve skid located 7km north east of Evelyn. 

See detailed map on our bulletin website

Show More

Bittern WI Pipeline replacement and tie in spool works - North Sea



Notification of commencement of Bittern WI Pipeline replacement and tie in spool works as per the condition of the Consent to Locate permit.


The works shall comprise the installtion of the following subsea pipeline or cable, or system of subsewa pipelines and cables:

 

- Bittern WI pipeline replacment and tie in spool

 

Dana intend to reinstate water injection at the Bittern field through installation of a new 12” water injection pipeline between the Triton FPSO and Bittern WA and WB XTs. The pipeline will be deployed by way of a pipelay vessel and laid on the seabed. The pipeline will subsequently be trenched and buried using a jet trencher. The pipeline will be accompanied by a number of jumpers and spools to tie-in to the water injection system. Rock placement, grout bags and mattresses may be required over the length of the pipeline.

 

As part of the system, they intend to install a 33.3 m tie-in spool connecting the new water injection pipeline (PL6609) to the WB XT. A combination of grout bags and concrete mattresses will be used to protect the pipeline.

See detailed map on our bulletin website

Show More

Bittern Valve Skid (BIVS) - North Sea



Notification of the commencement of the Bittern Valve Skid (BIVS)Works as per the condition of the Consent to Locate permit.


The Works shall be located at: 57 04' 58.69" N, 00 53' 20.47" E Block 21/30.

 

The structure will be loaded onto the installation vessel in Peterhead and seafastened before undertaking the short transit to the field. Upon arrival, the seabed will be prepared by the temporary installation of transponder beacons to allow accurate positioning. The ship's crane will pick up the structure and overboard it clear of any subsea assets. The vessel will then step into the desired location and lower the structure to the seabed. The ship's ROV will disconnect installation rigging and recover all transponders and a structure based gyro.

 

As the structure is required to be located within the FPSO swing circle, heading control will be arranged for the FPSO to maintain a safe clearance between the FPSO and construction vessel. Once installed no further navigation aids are required.

See detailed map on our bulletin website

Show More

Valaris V121 over Shearwater Alpha



Valaris V121 MODU jack-up rig will be situated over Shearwater Alpha platform. Valaris V121 MODU will be on location at Shearwater until June 2026.


Show More

Disclaimer

TO DOWNLOAD THIS FILE, YOU MUST AGREE TO THE TERMS AND CONDITIONS "TERMS" NOTED AT THE FOOT OF THIS WEBSITE WHICH APPLY TO YOUR USE OF THIS WEBSITE AND TO USE OF THE FILE YOU HAVE CLICKED TO DOWNLOAD. IF YOU DO NOT AGREE TO THE TERMS, YOU WILL NOT BE ABLE TO DOWNLOAD THE FILE AND YOU SHOULD NOT USE THIS WEBSITE. TO CONFIRM YOUR ACCEPTANCE OF THE TERMS AND TO COMMENCE THE DOWNLOAD OF THE FILE, PLEASE CLICK THE "DOWNLOAD" BUTTON. IF YOU DO NOT AGREE TO THE TERMS, PLEASE CLICK THE "CANCEL" BUTTON. YOUR ATTENTION IS DRAWN TO CONDITION 3 NOTED BELOW WHICH FORMS PART OF THE TERMS IN RELATION TO OUR LIABILITY TO YOU.

Agree and download Cancel
The website stores some data in your browser. We do not store any personal information. By clicking 'OK', you accept this. See our terms and conditions. OK